Around 115 thousand people have already been affected by the rain in the interior of Bahia | Aratu On

-

From the Editor

Dozens of municipalities in Bahia, according to a bulletin issued by the state government on Thursday night (1/2), continue to be hit by heavy rains. At the moment, there are 572 homeless people and 9,842 displaced people as a result of the direct effects of the disaster. The total number of people affected is around 115,000, and five deaths have already been recorded.

The numbers correspond to occurrences recorded in 33 municipalities in Bahia. Of this total, 23 are under an Emergency Situation decree: Dário Meira, Cotegipe, Ilhéus, Medeiros Neto, Ibicuí, Anagé, Muquém do São Francisco, Quinjingue, Wanderley, Ubaíra, Nova Canaã, Saubara, Iguaí, Lagoa Real, Cícero Dantas, Cansanção, Cravolândia, São Miguel das Matas, Monte Santo, Contendas do Sincorá, Mutuípe, Barra and Itaju do Colônia.

FIRE DEPARTMENT

The 17th BBM (Military Firefighter Battalion), as well as the Graer PMs, operate in the cities of Wanderley, Cotegipe and Muquém do São Francisco. In the city of Wanderley, teams from the Bahia Military Fire Department helped with the distribution and logistics of delivering basic food baskets and bales of water, sent by the State Government. Graer delivered 139 basic food baskets to the communities of Goiabeira, Baboseira, Riacho de Sacutiaba, Sacutiaba, Porto da Ilha, Lagoa da Onça, Riacho Grande, Poço da Onça and Vereda.

In the city of Muquém do São Francisco, military firefighters from the 17th BBM are providing guidance, monitoring, distribution of basic food baskets and mattresses

FOOD AND SHELTER

To assist residents of the affected areas, the State Department of Education (SEC) has provided shelter and food.

In the municipality of Medeiros Neto, at the extreme end, the Professional Education Center (Cetep) has already distributed, from Saturday until this Thursday, almost 1,500 meals to 120 homeless people.

The Dário Meira State School, in the south of the state, became accommodation for families who were left homeless. Six families were welcomed into the school space.

AFFECTED ROADS

The Bahia Infrastructure Secretariat (Seinfra/SIT) monitors highways in the South, Southwest, West and Northeast regions. To date, 29 incidents have been recorded, six of which have already been completed.

Roads with closed traffic:

BA-449 – Cotegipe – Jupaguá District: The heavy rains that occurred in West Bahia caused the collapse of 02 bridges on BA-449, between Cotegipe and the District of Jupaguá, KM 49 and 50 near the community of Alto Araguaia.

Enter. BA-120 – Districts of Caldeirão de Areia / Lagoa das Pedras / Riacho da Onça, in Monte Santo: The volume of rain in the region, aggravated by the collapse of dams before the highway, caused the rupture of a segment of the Access to the town of Caldeirão de Areia and the invasion of the track in a segment of the Access to Riacho da Onça, both in the municipality of Monte Holy. The company responsible for building the access was called to signal and close the section. A diversion is also underway to allow vehicles to pass through to access the villages.

Muquém do São Francisco – Ent. BA- 161 – Boa Vista do Pixaim: The heavy rains that fell in the region in recent days caused the water level to rise in one of the tributaries of the São Francisco River, invading the Access Highway to the District of Boa Vista do Pixaim (Muquém do São Francisco) and closing two points: at the Muquém access to the BA-161 highway and at the crossing over the Riacho Alegre, places where two bridges will be built (projects being developed by Seinfra). We observed that the municipality’s main access to BR-242 has normal traffic via the BA-172 highway. As the access paving work was in progress, the company was called to resolve the situation.

In the municipality of Muquém do São Francisco, the water level rose and there was flooding in the city center. The company responsible for maintaining the UOP in the region was called and is creating a natural ditch with a hydraulic excavator to drain water from the city’s main flooding.

Ent. BA-210 – Povoado de Correnteza (Sobradinho): The large volume of rain in Sobradinho raised the water level, causing it to cross over a wet passage located over the Riacho do Tatauí. There was also a break in the embankment at km 2.5, causing traffic interruption. There is no isolation of the Correnteza district, but a detour through the Barrinha community section where the bridge over the Riacho do Tatauí, recently built by Seinfra, is used, giving access to the BA-210.

Roads with half lane traffic:

BA-381 – Cansanção – Itiúba: The volume of rain in the region caused the water level to rise in one of the tributaries of the Jacurial River, at KM 79 on the BA-381 Highway, stretch: Cansanção – Itiúba. After local inspection, it was found that the elevation of the tributary caused erosion on the edge of the highway. The company responsible for the maintenance of Senhor do Bonfim was called in for intervention. Half-lane traffic signaling has already been done and recovery of the embankment body is underway. Expected completion in the first fortnight of February/24.

BA-262 – Nova Canaã – Potions: The stretch of Serra do Capa Bode was affected by heavy rains and has half-lane traffic due to the increase in erosion already existing in the area. The CISudoeste Public consortium was called in to reinforce the signage on the stretch.

BA-404 – Cipó – Buri: The volume of rain in the region caused the water level to rise in one of the tributaries of the Itapicuru River. The elevation caused the section to be blocked and damage to the edge of the pavement. The paving work on the access to the town of Buri is still being carried out and the company was called in to correct the edges of the pavement and reinforce the thalweg drainage (culvert). Completion is expected in March.

Free traffic:

Ent. BA-052 – Village of Jaguara (Feira de Santana)

BA-262 – Ilhéus – Uruçuca – BR-101 Junction

BA-381 – Quijingue – Cottons

BA-026 – Santo Antônio – Amargosa

BA-849 – Entrance. BR-242 – Palmeiras

BA-046 – Ruy Barbosa – Utinga

Attention points:

BA-262 – Anagé – Aracatu (Povoado de Jibóia): The crossing of the river over the track caused the destruction of the mouths and erosion at the exit of the culvert. The section is signposted and the recovery from the erosion of the culvert is underway and is expected to be completed in the first half of February/24.

Cotegipe – Rural Area of ​​Tabua: Due to the heavy rains that occurred in western Bahia, a bridge in the rural area of ​​Cotegipe, close to the community of Tabua, was submerged, presenting difficulties in transferring water.

BA-465 – Cotegipe – Aricobé Mission (Angical): Due to the heavy rains that occurred in West Bahia, a bridge on BA-465, in the village of Vaquetal, was submerged, causing difficulties in transferring water.

BA-120 – Cravolândia – 3 Arms: The heavy rains in the region caused flooding and traffic difficulties on the BA-120 Highway, an unpaved stretch. Improvement services will be carried out on the stretch until the second half of February.

BA-503 – Feira de Santana – Coração de Maria: The heavy rains in the region caused erosion on the edge of Highway BA-503, Feira de Santana (FSA) – Coração de Maria, close to the neighborhood of Santo Antônio dos Prazeres (FSA). The section is signposted and the restoration of the landfill is underway and is expected to be completed by 02/07/2024.

Access to the villages of Jacu, Barro Branco and Rio das Pombas (Nova Canaã): Due to heavy rain, a bridge over the Rio das Pombas collapsed.

BA-381 – Quijingue – Cansanção: The heavy rains in the region caused flooding and traffic difficulties on the BA-381 Highway, an unpaved stretch.

Wanderley – Povoado da Goiabeira: The heavy rains that hit the region during the month of January caused flooding and traffic difficulties. The company contracted to carry out the primary coating services has already been called in to carry out patrolling and improvement at localized points.

BA-839 – Urban Passage of BA-839, in Wanderley: The existing wooden bridge was damaged by heavy rains. Seinfra is updating the budget for the construction project for the Bridge over the Tijucuçu Riacho at the access to BA839 in Wanderley.

BR-242 – Castro Alves – BR-116 Junction (Paraguaçu): The crossing of the stream over the road caused the destruction of part of the shoulder and erosion at the exit of the culverts. Traffic signaling was carried out and recovery from the erosion of the culvert is scheduled for the first half of February/24.

BA-120 – Itapé – Itaju do Colônia: The heavy rains in the region caused flooding and subsidence, but there were no closures on the highway. The company responsible is awaiting an improvement in weather conditions to carry out the services.

BA-558 – Jequié – Itajuru District: The section is marked due to erosion caused by water from the Rio de Contas at KM 17.60, close to Tamarindo. The inspection has already been carried out on the section and detected flooded areas, erosion and partial collapse of the cut slope also at kilometers 11.4, 13.3 and 15.60. Maintenance services are underway and are expected to be completed by February 15th.

Access to the District of Itabaí (Macarani): The large volume of water covered the diversion implemented while the bridge restoration work is underway. The company responsible for maintenance was moved to the location. After an inspection carried out on Monday (29), the river level was found to have reduced, making it possible to pass over the diversion. Construction work on the bridge is ongoing and is expected to be completed in April.

Access to Caeté Açu (Vale do Capão) – Palmeiras: Heavy rains in the region caused flooding and traffic difficulties. The company contracted to carry out the paving services carries out improvement actions with completion scheduled for the first half of February.

BA-263 – Vitória da Conquista – Itambé: Heavy rains in the region caused the water level of a dam located on the Beija-flor farm, on the banks of BA-263, between Vitória da Conquista and Serra do Marçal, to rise, and the large flow of water caused erosion in the BA-263 at the exit of the culvert that crosses the highway. The company responsible for maintaining BA-263 was contacted by Seinfra and the recovery of the landfill will begin this February.

Follow our live broadcasts on www.aratuon.com.br/aovivo. Follow us on Insta, Facebook It is Twitter. If you want to send a complaint or suggestion for an agenda, send WhatsApp to (71) 99940 – 7440. Add us to your groups!


The article is in Portuguese

Tags: thousand people affected rain interior Bahia Aratu

-

-

PREV Arid climate in Brazil, Carlos Bolsonaro and Abin, agreement between Mercosur and the European Union: all episodes of the week of O Assunto | The subject
NEXT Tibau is the only municipality in RN with more households than inhabitants